11 am yesterday thought it was time to catch up with some jobs on the Stag, with an MOT coming up in July, so got going on doing both front strut inserts, rebush the anti roll bar and new drop links, D bushes on the drag links, repack the front wheel bearings with fresh grease and new steering rack gaiters.
All was going great until 4.00 when after completing the NS in it's entirety, and reassembled the OS apart from refitting the track rod end to the arm just so I could swing the hub round and give the bolts a final torqueing up at the bottom of the leg when one of the 3/8" unf bolts snapped off in the hub carrier
As I was going out last night all I could do was swear - a lot.
Guess what I'm going to be doing today.....
All was going great until 4.00 when after completing the NS in it's entirety, and reassembled the OS apart from refitting the track rod end to the arm just so I could swing the hub round and give the bolts a final torqueing up at the bottom of the leg when one of the 3/8" unf bolts snapped off in the hub carrier
As I was going out last night all I could do was swear - a lot.
Guess what I'm going to be doing today.....
Comment